Jumat, 23 Januari 2015

RENCANA ANGGARAN BIAYA PEMBANGUNAN GEDUNG YAYASAN DAN LEMBAGA PENDIDIKAN ISLAM YAYASAN UMM AL-BILAAD (Social, Humanity and Religious)



RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG YAYASAN DAN LEMBAGA PENDIDIKAN ISLAM
YAYASAN UMM AL-BILAAD (Social, Humanity and Religious)
NJATEN RT 29/RW 10 KEDONDONG KEBONSARI MADIUN – JAWA TIMUR

No
Pekerjaan
Vol
Sat.
Hrg.Sat.(Rp)
Jml.Hrg.(Rp)
Jml.Total (Rp)
I
1
2

II
1
2
3

III
1
2
3

IV
1

2
3


4


5


6


7


8


9


10


11


12


13



1



2



3



4


5



V
1
2
3
4

VI
1

VII
1
2
3
4

VIII
1

2

3
4
5
6
7
8

9
10
11
12
13
14
15
16
17
18

X
1
2
3
4
5
6
7
8
9
Pekerjaan Persiapan
Bongkar
Uitzet & Bouplank

Pekerjaan Tanah
Bor Strous
Galian Tanah
Urugan Pasir di bawah tanah

Pekerjaan Pasangan
Tembok 1 PC : 6 Ps
Plesteran
Benangan + Tali air

Pekerjaan Beton
Cor Strous Ø30 h: 3 m1
Pembesian D13, D8 Spiral
Lantai Kerja/Rabat
Poor
Pembesian D13
Bekesting
Sloof 20/40
Pembesian D13, D10, D8-20 cm
Bekesting
Sloof 15/25
Pembesian D13, D8-20 cm
Bekesting
Kolom 35/50 K1
Pembesian D16, D10, D8-20 cm
Bekesting
Kolom 25/25 K2
Pembesian D13, D8-20 cm
Bekesting
Kolom 15/30 K3
Pembesian D16, D13, D8-20 cm
Bekesting
Clukat
Pembesian D13, D8-20 cm
Bekesting
Balok 30/60
Pembesian D16, D10, D8-15 cm
Bekesting
Balok 20/40
Pembesian D16, D8-15 cm
Bekesting
Daag t=0, 12
Pembesian Ø8-15, Semi double
Bekesting
Tangga t=12 cm
Pembesian D13
Bekesting
Lantai II
Kolom 30/40 24 buah
Pembesian D13, D10
Ø8-20 cm
Bekesting
Kolom 25/25 12 buah
Pembesian D13
Ø8-20 cm
Bekesting
Kolom praktis 12/20 1 buah
Pembesian D10
Ø8-20 cm
Bekesting
Kolom praktis 11/11 6 buah
Pembesian Ø10, Ø6-20 cm
Bekesting
Ring 11/15, 12/20
Pembesian Ø10, Ø6-20 cm
Bekesting

Pekerjaan Kayu
Upah membuat kusen dengan kayu
Pas. Daun pintu panil jati
Pas. Daun jendela
Kaca mati

Pekerjaan Lantai
Lantai II 30 x 30

Pekerjaan Plafon
Upas Pas. Plafon Kayu
Pas. Plafon
Pas. Langit-langit calsiboard
Pas. Lis plafon kayu

Pekerjaan Atap
Kuda-kuda baru WF 200.100
                              WF 150.75
Flendes t=10 mm
               t=8 mm
Gording C 125.35.10
Jarum trak gording Ø12
Ikat angin/spantrack Ø14
Stopper gording L 50x50
Angkur baut
Baut 5/8 x 1 ½
             7/10 x 1
Jarum spantrack
Cat Primetop
Minyak cat
Upah kerja
Upah permak kuda-kuda
Pasang usuk reng baru
Pasang usuk reng
Pas. Genteng
Pas. Genteng bumbungan
Pas. Lisplank GRC

Pekerjaan Cat dan Finishing
Cat tembok baru
Cat plafon
Cat kayu/lisplank
Engsel pintu kupu-kupu
Pas. Engsel jendela kupu-kupu
Kait angin
Pas. Kunci pintu
Pas. Grendel pintu
Pas. Grendel jendela

0.75
0.75


171
12.765
19.71


321.893
1.266.42
1.355.28


12.0852
1289.68
13.4775
3.24
313.425
48
6.525
763.103
65.28
1.725
249.33
48
12.495
2072.19
121.38
2.3625
445.185
37.8
0.7275
169.47
9.72
3
439.455
52.0425
9.18
1612.19
62.745
15.93
1996.07
151.388
38.265
2933.94
318.87
0.7875
99.495
8.4375

8.64
510.48
182.505
100.8
1.545
147.758
45.225
24.75
0.285
26.88
12.7275
4.8
0.2175
51.96
3.96
5.7075
772.193
98.055


1.2225
8.6025
20.2125
20.2125


302.4


226.125
211
308.64
185.25


1087.5
294
165
91.38
1875
192.6
162
61.875
48
261
555
18
37.5
15
2662.46
623.99
41
261
261
29.925
80.1


695.025
177.51
80.8125
6
29.25
29.25
3
3
29.25

Is
Is


m1
m3
m3


m3
m2
m1


m3
kg
m3
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2
m3
kg
m2

m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
m2
m3
kg
m2


m3
m2
m2
m2


m2


m2
m2
m2
m1


kg
kg
kg
kg
kg
kg
kg
kg
bh
bh
bh
bh
kg
ltr
kg
kg
m2
m2
m2
m1
m1


m2
m2
m2
ps
ps
ps
bh
bh
bh

750.000
250.000


10.500
23.700
65.700


63.900
24.500
15.500


738.600
10.800
557.500
738.600
10.800
39.100
738.600
10.800
39.100
738.600
10.800
39.100
738.600
8.000
58.900
738.600
10.800
58.900
738.600
10.800
58.900
738.600
10.800
78.300
738.600
10.800
120.000
738.600
10.800
120.000
738.600
9.700
115.000
738.600
9.700
199.900

738.600
10.800
9.700
58.900
738.600
10.800
9.700
58.900
738.600
10.800
9.700
41.600
738.600
9.700
41.600
738.600
9.700
78.300


1.258.000
923.500
413.100
83.800


55.500


21.000
12.875
20.600
7.100


10.350
10.350
13.500
13.500
2.790
9.700
9.700
25.875
3.500
3.000
2.500
3.000
60.000
5.000
3.000
4.000
136.900
11.600
8.600
85.700
75.000


13.500
11.000
29.300
22.200
21.000
15.200
194.000
19.400
15.400

562.500
187.500


1.795.500
302.531
1.294.947


20.568.931
31.027.290
21.006.840


8.924.000
13.928.517
7.513.706
2.393.064
3.384.990
1.876.800
4.819.365
8.241.507
2.552.448
1.274.085
2.692.764
1.876.800
9.228.807
16.577.520
7.149.282
1.744.943
4.807.998
2.226.420
537.332
1.830.276
572.508
2.215.800
4.746.114
4.074.928
6.780.348
17.411.679
7.529.400
11.765.898
21.557.583
18.166.500
28.262.529
28.459.218
36.670.050
581.648
965.102
1.686.656

6.381.504
5.513.184
1.770.299
5.937.120
1.141.137
1.595.781
438.683
1.457.775
210.501
290.304
123.457
199.680
160.646
504.012
164.736
4.215.560
7.490.267
7.677.707


1.537.905
7.944.409
8.349.784
1.693.808


16.783.200


4.748.625
2.716.625
6.357.984
1.315.275


11.255.625
3.042.900
2.227.500
1.233.630
5.231.250
1.868.220
1.571.400
1.601.016
168.000
783.000
1.387.500
630.000
2.250.000
75.000
7.987.365
2.495.520
5.612.900
3.027.600
2.244.600
2.564.573
6.007.500


9.382.838
1.952.610
2.367.806
133.200
614.250
444.600
582.000
58.200
450.450



750.000




3.392.978




72.603.061
























































340.299.068





19.525.905


16.783.200





15.138.509






















63.265.098










15.985.954
JUMLAH
547.743.772
DIBULATKAN
547.744.000


Kantor sekretariat panitia pembangunan Pondok Pesantren Umm al-Bilaad di Njaten Dukuh Kandangan Desa Kedondong Rt 29/Rw 10 Kecamatan Kebonsari Madiun kode pos 63173 – Jawa Timur – Indonesia.

Phone Number           :  +6285735088970 (atas nama Pendiri Yayasan @Febri Hijroh Mukhlis)
e-Mail                        : ummulbilaad@yahoo.com
Website                      : ummulbilaad.blogspot.com
Nomor Rekening       : 6342-01-012971-53-2
ATAS NAMA YAYASAN UMM AL BILAAD
BANK BRIUNIT CABANG KEBONSARI MADIUN – JAWA TIMUR – INDONESIA.